Editorial, For the Record

For the Record

HARDWICK – As a clarification to the Hardwick Select Board meeting as reported in the October 18 edition of the Gazette, the Jeudevine Library addition will be attached to the side of the existing building but a redesign was necessary to raise the addition up due to the excessive groundwater. 

Comments are closed.